СИГНАЛИЗАЦИЯ ВА АЛОҚА МАСОФАСИНИНГ ИШ ХАЖМИНИ ВА ИШЧИЛАРНИНГ МЕХНАТ САМАРАДОРЛИГИНИ АНИҚЛАШ
Keywords:
техник ҳужжатлар, алоқа, автотранспорт, масофавий устахона, техник бирлик, электр (симли) ва радиоалоқа, телемеханика, техник хизмат кўрсатиш.Abstract
СЦБ, электр (симли) ва радиоалоқа, йўловчиларга ва хисоблаш техникасига хизмат кўрсатиш, айрим қурилмаларига мос келувчи техник бирликларни қийматлари темир йўл сигнализацияси ва алоқа масофасининг ходимлари сони нормативлари асосида ҳисобланади .
References
1.S. T. Boltayev and Q. A. Kosimova, "Railway Point Machine Control Automation Methods," 2022 International Ural Conference on Electrical Power Engineering (UralCon), Magnitogorsk, Russian Federation, 2022, pp. 290-294, doi: 10.1109/UralCon54942.2022.9906687.
2.S. T. Boltayev, R. B. Abdullaev, B. G. Ergashov and B. Q. Hasanov, "Simulation of a Safe Train Traffic Management System at the Stations," 2022 Conference of Russian Young Researchers in Electrical and Electronic Engineering (ElConRus), Saint Petersburg, Russian Federation, 2022, pp. 566-571, doi: 10.1109/ElConRus54750.2022.9755616.
3.Q. A. Kosimova, S. I. Valiyev and S. T. Boltayev, "Method and Algorithm of the Automatic Warning System of Train Approaches to Railways," 2022 International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM), Sochi, Russian Federation, 2022, pp. 532-538, doi: 10.1109/ICIEAM54945.2022.9787181.
4.H. Shang, Maintenance Modelling, Simulation and Performance Assessment for Railway Asset Management. DOCTEUR de l’UNIVERSITE DE TECHNOLOGIE DE TROYES, 1–222 (2015).
5.Sasidharan, M., Burrow, M., Ghataora, G., & Marathu, R. (2021). A risk-informed decision support tool for the strategic asset management of railway track infrastructure. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit. Advance online publication. https://doi.org/10.1177/09544097211038373.
6.Guler, H. (2012). Geographic information system-based railway maintenance and renewal system. Proceedings of the Institution of Civil Engineers: Transport, 165(4), 289–302. https://doi.org/10.1680/tran.10.00067.
7.Shang, H., Bérenguer, C., & Andrews, J. (2017). Delayed maintenance modelling considering speed restriction for a railway section. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 231(4), 411–428. https://doi.org/10.1177/1748006X17709200.
8.Lidén, T. (2015). Railway infrastructure maintenance - A survey of planning problems and conducted research. In Transportation Research Procedia (Vol. 10, pp. 574–583). Elsevier. https://doi.org/10.1016/j.trpro.2015.09.011.
9.Lidén, T. (2016). Towards concurrent planning of railway maintenance and train services. Towards concurrent planning of railway maintenance and train services. Linköping University Electronic Press. https://doi.org/10.3384/lic.diva-128780.
10.Rahimi, M., Liu, H., Cardenas, I. D., Starr, A., Hall, A., & Anderson, R. (2022, June 1). A Review on Technologies for Localisation and Navigation in Autonomous Railway Maintenance Systems. Sensors. MDPI. https://doi.org/10.3390/s22114185.
11.Shang, H. (2015). Maintenance Modelling, Simulation and Performance Assessment for Railway Asset Management. DOCTEUR de l’UNIVERSITE DE TECHNOLOGIE DE TROYES, 1–222.
12.Sa, J., Choi, Y., Chung, Y., Kim, H. Y., Park, D., & Yoon, S. (2017). Replacement condition detection of railway point machines using an electric current sensor. Sensors (Switzerland), 17(2). https://doi.org/10.3390/s17020263.